निर्माण पर्यवेक्षण एवं गुणवत्ता ऑडिट
चरण-वार साइट निरीक्षण, चेकलिस्ट-आधारित गुणवत्ता जाँच, सामग्री परीक्षण समन्वय और साइट पर बिल सत्यापन।
Most construction defects — honeycombed columns, short reinforcement laps, weak concrete, out-of-plumb walls — are invisible by the time the owner notices them. Our supervision service places a qualified engineer at your site at every critical stage: layout marking, footing reinforcement checks before pour, column verticality, slab shuttering and rebar inspection, and finishing quality. Each visit is documented against IS-code-based checklists with geotagged photos. We coordinate cube tests, sieve analysis, and brick/steel testing through NABL-accredited labs, and verify each contractor RA bill against measured site progress before you release payment.
कार्य का दायरा
- Residential bungalow and duplex construction supervision (visit-based or milestone-based)
- Commercial building periodic quality audits
- Critical-pour inspections (footings, columns, slabs) on 24-hour notice
- Concrete cube, steel tensile, brick compressive, and sieve test coordination
- Pre-payment verification of contractor RA bills against site measurements
प्रमुख डिलीवरेबल्स
- Stage-wise Inspection Reports with geotagged photo evidence
- IS-code-based Quality Checklists (reinforcement, shuttering, concreting, finishing)
- Material Test Coordination & NABL Lab Report Register (cube, sieve, steel, brick)
- Non-Conformance Reports (NCR) with rectification instructions
- On-site Contractor Bill Verification & Payment Recommendation Notes
- Monthly Progress & Quality Summary Dossier for the owner
क्लाइंट्स यह सेवा क्यों चुनते हैं
Catch Defects Before Concrete Sets
Pre-pour reinforcement and shuttering checks prevent defects that are impossible or ruinously expensive to fix later.
Pay Only for Work Done
Every contractor bill is cross-checked on site before payment — no inflated or premature claims.
Documented Quality Trail
Geotagged, dated inspection records protect you in disputes and support bank/valuation requirements.
हम कैसे काम करते हैं
चरण 01
Supervision Plan Setup
Freezing the inspection stage list, checklist set, visit frequency, and hold points with the owner and contractor.
चरण 02
Stage Inspections
Engineer visits at each hold point — layout, footing, column, slab, masonry, finishing — with pass/fail checklists.
चरण 03
Testing & NCR Tracking
Coordinating lab tests per IS sampling frequency and tracking rectification of every non-conformance raised.
चरण 04
Bill Verification & Reporting
Verifying contractor claims against measured progress and issuing the owner a monthly quality-and-payment dossier.
निःशुल्क सैंपल
Stage Inspection Checklist Pack with NCR & Test Register
फ़ॉर्मेट: PDF Checklist / Report Dossier
निर्णय लेने से पहले एक वास्तविक, वॉटरमार्क किया हुआ डिलीवरेबल देखें — आपको मिलने वाली गुणवत्ता और फ़ॉर्मेट स्वयं परखें।
अक्सर पूछे जाने वाले सवाल
A milestone-based plan typically involves 12–18 inspections from layout to finishing — concentrated at reinforcement checks before each pour, which are the highest-risk moments.
संबंधित सेवाएँ
क्वांटिटी एस्टिमेशन
स्ट्रक्चरल एवं आर्किटेक्चरल ड्रॉइंग्स से कंक्रीट, स्टील, चिनाई और फिनिशिंग कार्यों का उच्च-परिशुद्ध परिमाणन — CPWD/राज्य CSR दर विश्लेषण के साथ।
और जानेंBBS डिटेलिंग
कटिंग लंबाई, बेंड कटौती, व्यास-वार वज़न समेकन और स्क्रैप घटाने वाले एल्गोरिद्म के साथ मिलीमीटर-सटीक बार बेंडिंग शेड्यूल।
और जानेंकॉन्ट्रैक्टर बिलिंग
संयुक्त माप शीट (JMS), लागत सार, रनिंग अकाउंट (RA) बिल और वेरिएशन दावों सहित कॉन्ट्रैक्टर व क्लाइंट बिलिंग की संपूर्ण तैयारी।
और जानें