Aarav Lifestyle G+2 Luxury Duplex Enclave
Residential Duplex Featured

Aarav Lifestyle G+2 Luxury Duplex Enclave

VIP Road, Raipur, Chhattisgarh 14,500 Sq. Ft. (4 Luxury Units)

Turnkey architectural blueprint sanctioning, IS 13920 ductile rebar detailing, and complete item-rate contractor billing for an exclusive 4-villa G+2 duplex enclave in VIP Road, Raipur.

14,500 sq ft

Built-up Area

18 Days

Approval Turnaround

2.4%

Rebar Scrap Rate

₹3.8 Lakhs

Saved in Audits

Challenge Solved

Solved complex corner plot setback constraints while maximizing FAR utilization to 1.75; reduced rebar cutting wastage to 2.4% with custom 12m stock bar optimization.

Authority Sanction: Nagar Nigam Raipur & TCP Approved
Nagar Nigam BlueprintBBS Detailing (IS 13920)Quantity TakeoffContractor JMS Billing
Sanjeevani 120-Bed Multi-Specialty Hospital
Healthcare / Hospital Featured

Sanjeevani 120-Bed Multi-Specialty Hospital

Great Eastern (GE) Road, Raipur, CG 48,000 Sq. Ft. (B+G+4 Storey)

Comprehensive statutory healthcare blueprint preparation and municipal approval for a state-of-the-art 120-bed hospital facility adhering to NABH and NBC 2016 Part 4 institutional norms.

120 Beds

Hospital Capacity

B+G+4

Sanctioned Levels

2.40 m

Fire Corridor Width

1:12 IS 4963

Ramp Gradient

Challenge Solved

Engineered specialized architectural zoning ensuring 2.4m clear evacuation corridors, 1:12 barrier-free ramps with mid-landings, positive-pressure modular OT airlocks, and segregated biomedical waste loading bays.

Authority Sanction: Raipur Municipal Corp, TCP & Fire Dept NOC
Hospital Norms LayoutOT/ICU Sterile CorridorsStretcher Ramp 1:12BMW LayoutFire Safety Dossier
Capital Trade Tower — Commercial Plaza & Offices
Commercial Complex Featured

Capital Trade Tower — Commercial Plaza & Offices

Pandri Commercial Hub, Raipur, CG 62,000 Sq. Ft. (2B+G+7 Storey)

Independent engineering bill auditing, high-rise concrete & steel volume verification, and monthly contractor RA bill certifications for a landmark commercial retail & corporate office tower.

₹14.2 Cr

Total Value Audited

₹18.4 Lakhs

Total Direct Savings

14.2 MT

Steel Variance Detected

Monthly Continuous

Audit Cycle

Challenge Solved

Identified ₹18.4 Lakhs in contractor over-claims through forensic JMS recalculation; resolved concrete over-pour disputes by matching theoretical structural volumes with RMC dispatch logs.

Authority Sanction: Nagar Nigam & Town & Country Planning (TCP)
Bills AuditingTender BOQ AnalysisTheoretical Material ReconciliationCPWD CSR Mapping
Shri Radhe Green Valley 22-Acre Township Layout
Township & Layout

Shri Radhe Green Valley 22-Acre Township Layout

Nava Raipur (Atal Nagar) Peripheral Zone, CG 22.4 Acres (240 Residential Plots)

Master planning, land use change/diversion layout sanction, and statutory TCP blueprint approval for a 22.4-acre gated residential plotted development.

22.4 Acres

Layout Area

240 Plots

Plots Created

10.5%

Open Green Area

100% Cleared

Diversion Sanction

Challenge Solved

Successfully aligned internal 9m and 12m road networks with the regional Master Plan 2031 grid, integrating natural drainage contour slopes to eliminate monsoon waterlogging.

Authority Sanction: TCP Chhattisgarh & Colonizer License Approval
TCP Zoning ComplianceLand Diversion (Vyapavartan)10% Open Space LayoutEWS/LIG Planning
Major RCC Bridge & Flyover Rebar Detailing (Pan-India)
Infrastructure / Highway Featured

Major RCC Bridge & Flyover Rebar Detailing (Pan-India)

National Highway EPC Project (Remote Freelance) 4-Span RCC Box Girder & Pier Substructures

Remote freelance Bar Bending Schedule detailing for 4-span continuous RCC box girders, pier caps, pile caps, and abutment retaining walls on a major National Highway expansion package.

680+ MT

Total Steel Detailed

IRC:112 / IS 13920

Codes Followed

1.9%

Cutting Waste

10 Working Days

Delivery Time

Challenge Solved

Detailed 680+ metric tonnes of high-density thermo-mechanically treated (TMT) Fe550D rebar with zero site clashing in congested pier-cap tendon anchoring zones.

Authority Sanction: IRC:112 & IS 13920 Compliant
BBS DetailingIRC 112 ComplianceBox Girder Rebar DetailingScrap Reduction

Want your project on this page?