Proof of Work

Engineering Sample Library

Preview real, watermarked deliverables — approval blueprint sets, BBS sheets, RA bill packages and audit reports — before you engage us. Judge the quality yourself.

Sample Nagar Nigam Approved Blueprint Set (Raipur Municipal Standard)Government Approvals

Sample Nagar Nigam Approved Blueprint Set (Raipur Municipal Standard)

Complete statutory building permission drawing set prepared according to Raipur Municipal Corporation (RMC) bylaws, including site layout, floor plans, sections, elevations, FAR calculation table, and Rainwater Harvesting details.

PDF Drawing Set (Watermarked)4.8 MBPages: 6 Sheets (A1 Size)

Technical Highlights

  • Site plan showing 12.0m road width and setback dimensions
  • FAR/FSI calculation table and ground coverage breakdown
  • Staircase, lift core and toilet cross-sections with headroom clearances
High-Rise RCC Bar Bending Schedule (IS 2502 / IS 13920)BBS & Rebar

High-Rise RCC Bar Bending Schedule (IS 2502 / IS 13920)

Mathematical formula-driven rebar cutting schedule for footings, high-rise columns, ductile beams, and two-way slabs with bend deduction algorithms, shape codes, and scrap reduction summaries.

Excel (.xlsx) / PDF Preview2.4 MBPages: 12 Detailed Sheets

Technical Highlights

  • Standard IS 2502 bend deduction formula (1d/2d/3d) integration
  • Diameter-wise consolidated rebar tonnage breakdown (8mm to 32mm)
  • 12-meter stock rebar optimization pattern with <2.5% cutting waste
Contractor Joint Measurement Sheet (JMS) & RA Bill PacketBilling & JMS

Contractor Joint Measurement Sheet (JMS) & RA Bill Packet

Airtight Running Account (RA) billing package containing itemized Joint Measurement Sheets (JMS), Abstract of Cost, deviation statements, and tax deduction schedules.

Excel (.xlsx) & Certified PDF3.1 MBPages: 18 Pages

Technical Highlights

  • Item-wise JMS linked directly to tender BoQ line items
  • Retention money, mobilization advance & GST deduction formulas
  • Pour-card and delivery challan cross-reference indexing
Forensic Material Reconciliation & Bill Audit ReportAuditing & Tendering

Forensic Material Reconciliation & Bill Audit Report

Third-party engineering audit report comparing theoretical vs. actual consumption of structural steel and cement, highlighting disallowed contractor claims and net recovery amounts.

Executive Audit PDF1.9 MBPages: 8 Pages

Technical Highlights

  • Theoretical steel calculation using IS standard densities vs. invoiced MT
  • Cement bag consumption constants calculated per grade (M20, M25, M30)
  • Forensic itemized breakdown of ₹12.5L in disputed over-billings

Need a custom BOQ, BBS or audit for your own project?

These samples show our standard. Send us your drawings and we will prepare the same deliverables tailored to your site conditions and state CSR.