Quantity Take-Off & Cost Estimation Services
Item-wise micro-quantification from 2D/3D drawings with CPWD & State CSR rate analysis.
Our Quantity Take-off & Estimation service bridges raw architectural/structural drawings and accurate on-ground financial planning. We extract every millimetre of material requirement using IS 1200 measurement standards. Whether you need pre-construction cost modeling, bank loan DPR estimates, or subcontractor procurement targets, we deliver crystal-clear, audit-proof itemized schedules.
Scope Covered
- Earthwork & Excavation calculations with lead/lift analysis
- Plain & Reinforced Cement Concrete (PCC/RCC) structural elements
- Masonry (AAC blocks, fly ash bricks, red clay bricks)
- Waterproofing, thermal insulation, and expansion joint systems
- Internal & external architectural finishes, painting, tilework, and false ceilings
Key Deliverables
- Comprehensive Itemized Bill of Quantities (BOQ)
- Substructure & Superstructure Concrete Quantity Breakdown
- Structural Steel Reinforcement Summaries
- Brickwork, Plastering, Flooring & Finishing Quantities
- Rate Analysis Sheets mapped to latest PWD / CPWD CSR rates
- Material Procurement Forecast Schedule
Why Clients Choose This Service
Fast 48-Hour Turnaround
Rapid deliverables designed to meet tight tender submission deadlines.
Bank DPR Ready
Standardized formatting recognized by leading financial institutions and government funding bodies.
Zero Estimation Leakage
Prevent 8–15% budget overruns by identifying drawing discrepancies before procurement starts.
How We Work
Step 01
Drawing Ingestion
We review your 2D AutoCAD (.dwg), Revit (.rvt), or PDF drawing packages and verify cross-sections.
Step 02
Layered Measurement
Item-wise quantification using IS 1200 protocols with automated deduction formulas for openings.
Step 03
CSR / Market Rate Mapping
Application of relevant State CSR (Chhattisgarh PWD / CPWD) or current local market vendor rates.
Step 04
Final BOQ & Handover
Delivery of fully unlocked, formula-driven Excel workbooks and presentation-ready PDF reports.
Free Sample
Detailed Quantity Takeoff & Rate Analysis Workbook
Format: Excel / PDF
Review a real, watermarked deliverable before you commit — see exactly the quality and format you will receive.
Frequently Asked Questions
We accept AutoCAD (.dwg, .dxf), Revit (.rvt), IFC BIM models, and vector PDF drawing sets.
Related Services
BBS Detailing
Millimetre-accurate bar bending schedules with cutting lengths, bend deductions, diameter-wise weight consolidation, and scrap reduction algorithms.
Learn MoreContractor Billing
End-to-end contractor and client billing preparation, including Joint Measurement Sheets (JMS), Abstract of Cost, Running Account (RA) bills, and variation claims.
Learn MoreBills Auditing
Third-party engineering audits to detect billing inflations, verify measurement authenticity, and conduct structural steel & cement material reconciliations.
Learn More